chapman university braden hall

 

cost: $33.5 m

client: mve architects

The project consisted of a four-story building of 302-bed dormitory and apartment-style housing over a single level podium parking garage. The facility also includes a 26,000 sq. ft. full-service dining hall with an 11,000 sq. ft. Conference facility, special guests suites, Alumni Center and Career Development Center above. The facility is served by a high-efficiency central chilled water/ hot water system with variable speed pumping. The dormitory rooms are served by four-pipe fan coil units. The larger areas have central air-handlers with economizers and variable speed drives on the roof. The domestic heating system is served by a central high-efficiency hot water boiler. A central DDC control system controls all aspects of the HVAC system. The project is a LEED Gold project.

Square Footage: 127,000 sq. ft.