We are a full mechanical engineering organization that specializes in sustainability and design. We love what we do and we love working with people like you.
We are a full mechanical engineering organization that specializes in sustainability and design. We love what we do and we love working with people like you.
Ontario, CA Provided mechanical, electrical, and plumbing engineering and Commissioning Services for the project. This project included the renovation of the existing training facility (approximately 28,300 square feet) and 50,000 square feet expansion at the Ontario, CA facility. The total project cost for this was $20 million.
Pasadena, CA Mechanical and plumbing services for the Semlow TI and Frog Lab in basement. Semlow Lab (appx. 2,357 sf) building area for standalone module inside existing building.
Long Beach, CA Project concerned light-industrial facility including office and manufacturing space, in the city of Long Beach. This project consisted of two phases.
Pasadena, CA Various projects done at this location which involved fan upgrades, chiller room modifications, boiler replacements and more.
Glendale, CA This project consisted of modifying the existing space to accommodate new Philips Bi Plane Angio Lab System.
Riverside, CA The project focused on mechanical, electrical, and plumbing scope for offices, BSL-2 area.BSL-3 lab.
Lake Forest, CA Project included replacing Central plant and central compressed air system for facility.
Aliso Viejo, CA The project included a 97,000 sf 3-story STEM lab and was comprised of variable volume chilled and hot water air- handlers, lab variable volume ventilation systems with flow controls, and lab ventilation systems.
Pasadena, CA This project included providing new Air cooled chiller, Pumps and Air rotation units with heating furnace to provide air conditioning the warehouse. The project cost for this totaled to $1 million.
Ontario, CA This project included a 250,000 sf distribution facility for lighting products. Also included was new HVAC and ventilation as well as new lighting for facility. Project included high efficiency HVAC lighting systems for energy savings. This project cost amounted to $4.5 million.
Sacramento, CA The project included a new central plant for the central distribution facility. This included the engineering design for new chillers, pumps, cooling towers, and new existing VFD’s. The scope also included a new EMS controls system. This project cost was $2.4 million.
Anaheim, CA The tenant improvement for this facility included the existing building which was beading a cold room and production areas. It also included processing equipment. The Refrigeration Cold room equals 14,000 sf and 7,700 sf for production rooms. The remainder of the area is conditioned warehouse. The project cost for this was $4.2 million.
Santa Ana, CA A leading provider of Pharmaceutical Preparations since 2003, the facility is equipped with several clean rooms for preparation work including ISO-6 (class 1000) to ISO-5 (class 100) certified clean rooms.
Irvine, CA Engineering Lab building on campus includes ISO-5 clean rooms for research. The project cost for this was $4.5 million.
Chino, CA This project included a 250,000 sf distribution facility for lighting products. This project cost amounted to $4.5 million.
Irvine, CA This project was primarily concerned with the conversion of an existing LFSX and COE building space into various different areas and rooms.