high tech

 
 
CARLSBAD FIRE STATION

bmw RND training center ontario

Ontario, CA Provided mechanical, electrical, and plumbing engineering and Commissioning Services for the project. This project included the renovation of the existing training facility (approximately 28,300 square feet) and 50,000 square feet expansion at the Ontario, CA facility. The total project cost for this was $20 million.

cal tech semlow biochem & molecular biology lab pasadena

Pasadena, CA Mechanical and plumbing services for the Semlow TI and Frog Lab in basement. Semlow Lab (appx. 2,357 sf) building area for standalone module inside existing building.

APF.jpg

terraform rocket lab long beach

Long Beach, CA Project concerned light-industrial facility including office and manufacturing space, in the city of Long Beach. This project consisted of two phases.

 
Jet+Propulsion+Laboratory+Pasadena.jpg
West-Tower-Vertical.jpg
Image-Coming-Soon (1).png

jpl

Pasadena, CA Various projects done at this location which involved fan upgrades, chiller room modifications, boiler replacements and more.

Philips Bi Plane Angio Lab Glendale Adventist hospital

Glendale, CA This project consisted of modifying the existing space to accommodate new Philips Bi Plane Angio Lab System.

the wonderful company bsl 2 & 3 Lab Buildings

Riverside, CA The project focused on mechanical, electrical, and plumbing scope for offices, BSL-2 area.BSL-3 lab.

 
Alcon+Labs.jpg
soka.jpg
IMG_4430.jpg

alcon laboratories

Lake Forest, CA Project included replacing Central plant and central compressed air system for facility.

soka microbiology stem lab

Aliso Viejo, CA The project included a 97,000 sf 3-story STEM lab and was comprised of variable volume chilled and hot water air- handlers, lab variable volume ventilation systems with flow controls, and lab ventilation systems.

amazon dps1 pasadena

Pasadena, CA This project included providing new Air cooled chiller, Pumps and Air rotation units with heating furnace to provide air conditioning the warehouse. The project cost for this totaled to $1 million.

 
Harris Freeman, Anaheim CA.jpg

RAB lighting ontario mills parkway

Ontario, CA This project included a 250,000 sf distribution facility for lighting products. Also included was new HVAC and ventilation as well as new lighting for facility. Project included high efficiency HVAC lighting systems for energy savings. This project cost amounted to $4.5 million.

 

walgreens distribution facility

Sacramento, CA The project included a new central plant for the central distribution facility. This included the engineering design for new chillers, pumps, cooling towers, and new existing VFD’s. The scope also included a new EMS controls system. This project cost was $2.4 million.

 

harris freeman anaheim

Anaheim, CA The tenant improvement for this facility included the existing building which was beading a cold room and production areas. It also included processing equipment. The Refrigeration Cold room equals 14,000 sf and 7,700 sf for production rooms. The remainder of the area is conditioned warehouse. The project cost for this was $4.2 million.

 
 
a.jpg

MD pharmaceutical santa ana

Santa Ana, CA A leading provider of Pharmaceutical Preparations since 2003, the facility is equipped with several clean rooms for preparation work including ISO-6 (class 1000) to ISO-5 (class 100) certified clean rooms.

uc irvine engineering laboratory

Irvine, CA Engineering Lab building on campus includes ISO-5 clean rooms for research. The project cost for this was $4.5 million.

amazon dla7 facility

Chino, CA This project included a 250,000 sf distribution facility for lighting products. This project cost amounted to $4.5 million.

 
 
 
 

edwards lifesciences building

Irvine, CA This project was primarily concerned with the conversion of an existing LFSX and COE building space into various different areas and rooms.