high tech

 
 
CARLSBAD FIRE STATION

bmw RND training center ontario

Ontario, CA Provided mechanical, electrical, and plumbing engineering and Commissioning Services for the project. This project included the renovation of the existing training facility (approximately 28,300 sf) and 50,000 square feet expansion at the Ontario, CA facility.

APF.jpg

terraform rocket lab long beach

Long Beach, CA Project concerned light-industrial facility including office and manufacturing space, in the city of Long Beach. This project consisted of two phases which focused on underground plumbing and new electrical infrastructure work to the main service and the buildout of phase 1 scope including new HVAC. This was LEED-certified project.

Jet+Propulsion+Laboratory+Pasadena.jpg

jpl

Pasadena, CA Various projects were performed at this laboratory location which involved fan upgrades, chiller room modifications, boiler replacements and more.

West-Tower-Vertical.jpg
soka.jpg
Alcon+Labs.jpg

Philips Bi Plane Angio Lab Glendale Adventist hospital

Glendale, CA This project consisted of modifying the existing space to accommodate new Philips Bi Plane Angio Lab System.

soka microbiology stem lab

Aliso Viejo, CA The project included a 97,000 sf 3-story STEM lab and was comprised of variable volume chilled and hot water air- handlers, lab variable volume ventilation systems with flow controls, and lab ventilation systems.

alcon laboratories

Lake Forest, CA Project included replacing Central plant and central compressed air system for facility.

IMG_4430.jpg

amazon dps1 pasadena

Pasadena, CA This 157,000 sf project included providing new Air cooled chiller, Pumps and Air rotation units with heating furnace to provide air conditioning the warehouse.

walgreens distribution facility

Sacramento, CA The project included a new central plant for the central distribution facility. This included the engineering design for new chillers, pumps, cooling towers, and new existing VFD’s. The scope also included a new EMS controls system. This project cost was $2.4 million.

RAB lighting ontario mills parkway

Ontario, CA This project included a 250,000 sf distribution facility for lighting products. Also included was new HVAC and ventilation as well as new lighting for facility. Project included high efficiency HVAC lighting systems for energy savings.

MD pharmaceutical santa ana

Santa Ana, CA A leading provider of Pharmaceutical Preparations since 2003, the facility is equipped with several clean rooms for preparation work including ISO-6 (class 1000) to ISO-5 (class 100) certified clean rooms.

a.jpg

uc irvine engineering laboratory

Irvine, CA Engineering Lab building on campus includes ISO-5 clean rooms for research. The project cost for this was $4.5 million.

Harris Freeman, Anaheim CA.jpg

harris freeman anaheim

Anaheim, CA The tenant improvement for this facility included the existing building which included a refrigeration cold room (14,000 sf) and production areas (7,700 sf). It also included processing equipment area. The remainder of the area is conditioned warehouse.

More Projects:

edwards lifesciences building

Irvine, CA This project was primarily concerned with the conversion of an existing LFSX and COE building space into various different areas and rooms.

amazon dla7 facility

Chino, CA This project included providing a new HVAC including single zone packaged DX VAV units with heating furnace on ground to condition the warehouse.

the wonderful company bsl 2 & 3 Lab Buildings

Riverside, CA The project focused on mechanical, electrical, and plumbing scope for offices, BSL-2 area.BSL-3 lab. It was comprised of rooftop a/c units, plumbing for restroom, lighting and other elements.

cal tech semlow biochem & molecular biology lab pasadena

Pasadena, CA Mechanical and plumbing services for the Semlow TI and Frog Lab in basement. Semlow Lab (appx. 2,357 sf) building area for standalone module inside existing building.