worship

 
 
LA_Faith_Dome.jpg

crenshaw christian center los angeles

Los Angeles, CA This location included assessments and ROM preparation for HVAC replacement which specifically included providing assessment service to establish a ROM cost for HVAC replacement for the Faith Dome building.

holy family church2.JPG

holy family catholic church hesperia

Hesperia, CA Holy Family Church located in Hesperia, California consists of 750 seat assembly space, cry room offices, meeting rooms, etc. Total project cost for this amounted to $7 million. This project was Design-Build.

Influence+Church+Anaheim.jpg

influence church anaheim

Anaheim, CA This project included various remodels and infrastructure upgrades.

 
Refinery.jpg
SaintNicholasChurch.jpg

our lady of la vang santa ana

Santa Ana, CA The project consisted of the preparation of construction documents for the Our Lady of La Vang Catholic Church Capital project. . The total square footage was approximately 50,000 sf. The scope included Church to seat 1,200, Cry Room and attached Chapel to seat 200 Parish, Plan check for the Capital Project’s building permits, Bidding the work with general contractors, and Construction administration, furniture fixtures and equipment, parish move in (from the former convent) through project closeout.

saddleback church lake forest & anahaim

Lake Forest & Anaheim, CA These facilities included multiple projects which included but was not limited to: HVAC renovation, the re-purposing of existing facility buildings, etc.

 

st. nicholas parish center laguna woods

Laguna Woods, CA This project consisted of a new, 15,000 sq. ft. parish. The project cost for this amounted to $3.5 million.

 
 
st+patricks+moreno+valley.jpg
DSC_7632.jpg
View1_2000Alton.jpg

st. patrick’s church moreno valley

Moreno Valley, CA St. Patrick Catholic Church in Moreno Valley, CA, a parish in the Diocese of San Bernardino. Project cost amounted to $5.5. million. Project was Design-Build.

suddhavasa buddhist meditation riverside

Riverside, CA This project included a new stand-alone 2,620 sf building on campus of the center.

chirst our savior catholic parish santa ana

Santa Ana, CA The details for this project included the mechanical services for a 1 story Parish Center and Sanctuary.

 
14336493657_9693f9c2c4_b.jpg
Church+OC.jpg

sisters of st. joseph orange

Orange, CA The details for this project included providing new HVAC for church including zoning 2 classrooms, 1 meeting room, and approximately 9 offices. Project included a new VRF 20-ton system with ducted/ductless fan coils and outside air, air distribution, controls, and condensate drain piping. It consisted of mechanical, electrical, an structural engineering.

 
 

chinese baptist church of central oc irvine

Irvine, CA Project included replacing the existing wall-mounted HVAC with new DX system HVAC for church for nine classrooms and four offices. It included mechanical, electrical, and structural engineering.