education

 
 
m.jpg

beverly hills high school | Science & Technology Center

Beverly Hills USD This state-of-the-art facility is a new Science Center that connects the existing campus includes 18 math classrooms, 12 science labs, a 100 student fixed seat lecture hall, faculty work areas, and a multi-purpose Educational Development Center. The total project cost was $16 million.

image-asset.jpg

el cerrito high school various buildings

West Contra Costa Unified School District The reconstruction of El Cerrito High School serves as the new educational environment for 1600 students. The administration, library, and community support programs are semi-public areas. The classrooms are the private and as such are recessed from the noise and distraction of the streets by a minimum distance set during master planning. The total project cost was $130 million.

LJM_Front.jpg

lisa j. mails elementary school

Murrieta USD The school's eight buildings house 39 classrooms (including four Kindergarten classrooms and one computer lab), a library, a multipurpose room, a kitchen, a preschool, an after-school childcare, and administrative spaces. The total cost for this project was $22 million.

 
DSC_6947.jpg
Richard+Crane+ES.jpg
Cunha.jpg

lawrence e. jones middle school

Cotati-Rohnert Park USD The project primarily concerned the consulting engineering services necessary. It consisted of the assessment services of the existing permanent buildings at Lawrence Jones Middle School.

richard crane elementary school modernization

Cotati-Rohnert Park USD This project included the modernization of the school which utilized both mechanical and plumbing engineering. The total project cost was $7 million.

 

cunha intermediate

Cabrillo USD This project was focused around the commissioning process as it was executed as required to meet the guidelines of commissioning. The total project cost was $11.3 million.

 
 
Colton+HS.jpg
OCSA.jpg

colton high school

Colton Joint USD This was designed as a full comprehensive high school, grades 9-12, with a master planned enrollment capacity of 3000 students. The total cost for this project was $87 million.

 

perris high school

Perris UHSD Heritage High School is a sprawling state of the art facility providing students a safe and secure learning environment. The total cost for this project was $80 million.

 

orange county school of the arts

Orange County Department of Education Project was mostly focused on the cooling tower replacement with other services such as VAV retrofit ad direct digital controls.

 
 
Corona+del+Mar+High+Newport+Beach.jpg
Newport+Elementary.jpg
Waldorf+School+of+OC.jpg

corona del mar high school

Newport Mesa USD This project included mechanical, electrical, structural, and architectural services for design.

 

newport elementary school

Newport Mesa USD The project focused on provision for new HVAC including cooling systems for administration and classrooms, library and misc. room such as teacher’s lounge.

 

waldorf school of orange county

Newport Mesa USD The project included mechanical, electrical, structural and architectural services necessary for the design and construction of school.

 
 
516508+-+Pinole+Valley+High+School+-+3.jpg
Public+Safety+Academy+-+2.jpg
Suisun+Valley+K-8+-+1.jpg

pinole valley high school

West Contra Costa USD This project included an evaluation and schematic plans for some of the existing buildings on the campus.

public safety academy

Fairfield-Suisun USD This project consisted of a new Library with the associated scope being the library, reading room(s), and classroom(s), innovation labs, and office(s) and support areas. The total cost for this project was $25 million.

 

suisun valley k-8

Fairfield-Suisun USD This project included the new library which also encompassed reading and study rooms, innovation labs, staff lounge, and office(s) and support areas.