goleta valley college hospital mob

Goleta-Valley-Cottage-Hospital-Front-02.jpg
 

cost: $

client: swa architects

For this project which is located in Santa Barbara, OED provided commissioning support to the 3rd party commissioning agent (CxA) for this project. The systems that were commissioned included HVAC systems, temperature controls, and domestic hot water systems. The equipment that was commissioned included packaged DX VAV units, VAV boxes, space heating boiler, space heating pumps, exhaust fans, and temperature controls. 

Square Footage: 52,000 sq. ft. (total sf)