sisters of st. joseph orange

14336493657_9693f9c2c4_b.jpg
 

cost: $ m

client: airflow mechanical

The details for this project included providing new HVAC for church including zoning 2 classrooms, 1 meeting room, and approximately 9 offices. The HVAC scope included a new 20-ton VRF system with ducted/ ductless fan coils and outside air, Air distribution, controls, condensate drain piping, and Title-24 calculations. The electrical and structural scopes were also included. 

Square Footage: ____ sq. ft.